We do take part in tender to through our quotation. We jump to the next step after winning the project.
Time 2-3 weeks usually
02
Estimation
After taking required documents from the tender we estimate the project with our qualified estimator.
Not more than 2 weeks
03
Drafting
After wining the project and getting approval on the quotation from the client; we go for site measurements and rectify the measured values with the design. If there is found something different, we immediately consult with designer. After getting amendments notes from the designer, we run after making shop drawing for the items including in the projects.
Time depends on the size of the project
04
Approval on Shop Drawing
After the preparation of the shop drawing we send those to the clients to see what actually going to happen. We value our client’s opinion and rectify it with modifying the shop drawing. If there any comments coming from the designers or clients, we go through our standard processes. After rectifying all the comments we send the revisions of the drawings to get approval.
Not more than 2 weeks
05
Manufacturing
When client approves the shop drawing, we jump into the production processes. Here we follow all the required steps to get the production done. Ordering materials, hardware, tools, finishes, and all the other required things are done in this process.
Time depends on the size of the projects
06
Installation
After finishing the manufacturing the items; we go for the installation of the items. We physically go to the site and measure everything to install the items. According to the plan design; our site manager do everything precisely as mentioned in the design.
Time depends on the size of the projects
07
Follow Up
During the manufacturing and installation of the project; we regularly follow up the things what is happening and what is going to happen. We do value the clients thought in our work. Everything we do to satisfy our clients.